» Skip to content

Menu

Case Studies

Bells Brae School Curtain Walling

Bells Brae School Curtain WallingCompleted works comprised the replacement of the existing curtain walling system, which involved the erection of a temporary weatherproofing system to the adjoining classrooms before dismantling the existing curtain walling system and replacing it with the new system. Read more

Brae/Mavis Grind 11kV Refurbishment

Brae/Mavis Grind 11kV RefurbishmentCompleted works comprised of excavation for and installation of 4700m of 3 nr single core 11kV cables and 1700m of 1 nr 3 core 11 kV cable. Read more

Brae Septic Tank Upgrade

Brae Septic Tank UpgradeUpgrade of existing septic tank. Read more

Bressay WTW Upgrade

Bressay WTW UpgradeCompleted works comprised the upgrading of the water treatment works (WTW) in Bressay, Shetland. Read more

Eela Water Treatment Works

Eela Water Treatment WorksIn 1978 it was found that the existing water treatment works at Eela Water did not meet current water quality requirements. The contract was to upgrade the existing facility to meet these regulations. Read more

Gremista Landfill Site

Gremista Landfill SiteThe completed works consisted of stripping 2.2 hectares of peat, some depths of which up to 10m in places, site prepared ready for the installation of the liner and geotextile. Read more

HPPE Pipe Sleeve Collars

HPPE Pipe Sleeve CollarsPipe collars required to sink the HPPE pipe to sea bottom and to hold in place until covered. Read more

Muckle Roe Cemetery Extension

Muckle Roe Cemetery ExtensionCompleted works comprised the extension of existing cemetery including new access road, dry stone wall construction and associated drainage works. Read more

New Hanger – Scatsta Airport

New Hanger – Scatsta AirportThe work comprised of a new hanger building together with modifications to the existing apron area, located at Scatsta Airport 17 miles north of Lerwick and serves Sullom Voe Oil Terminal. Read more

New Moorfield Hotel

New Moorfield HotelCompleted works comprised of all excavations and filling. The supply and installation of quarry materials and concrete. Read more

Northmavine Mains Renewal

Northmavine Mains RenewalCompleted works consists of the upgrade of 3000m of PVC pipe to new 160mm HPPE pipe including all ancillary works. Read more

Salmon Smolt Hatchery Civil Works

Salmon Smolt Hatchery Civil WorksReclamation of addition ground from the sea including infilling, geotextile & rock armour. Read more

~NEW~Bridge End Outdoor Centre - Upgrade Of Facilities PH1

~NEW~Bridge End Outdoor Centre - Upgrade Of Facilities PH1Reclamation of existing foreshore using imported rockfill and armour stone protection, construction of new concrete quay with new pontoon and gangway. A new caravan pitch area in concrete suitable for four caravans will also be created. Read more

Luggies Knowe Wind Turbine

Luggies Knowe Wind TurbineConstructed a 425m long access track and 1200m2 crane pad to allow the erection of an Enercon E-82 Turbine. Read more

New AHS and Hostel

New AHS and HostelSupplied concrete and pump for the construction of the New Anderson High School and Hostel buildings. Read more

Dales Voe Pier

Dales Voe PierSupplied concrete and pump for the construction of the new pier at Dales Voe. Read more