Lerwick office:
Supplied concrete and pump for the construction of the New Anderson High School and Hostel buildings.
In 1978 it was found that the existing water treatment works at Eela Water did not meet current water quality ...
The completed works consisted of stripping 2.2 hectares of peat, some depths of which up to 10m in places, site prepared...
Reclamation of additional ground from the sea including infilling, geotextile & rock armour. Excavation & ...